Amidst delays, south India’s first double-decker flyover in Bengaluru begins ‘trial run’
6 months ago
40
The flyover, which is built by the Bangalore Metro Rail Corporation Limited’s (BMRCL), spans 5.12 kilometers and was constructed at a cost of ₹449 crore.